HOME   |   ABOUT US   |   PROJECTS   |   CONTACTS
Bookmark and Share

 

Installation of sub-duct and cable will be installed based on survey data results. We provide testing of cable quality before and after installation. Safety measurements are an essential part of our installation process. In the absence of readily available ductings or manholes, our surveys performed can pinpoint appropriate locations for new duct routes.

Our land plant team is able to provide following services:-

  1. Fiber optic cable splicing and pulling
  2. Power cable jointing and pulling
  3. Earth cable jointing and pulling
  4. HDPE Sub-duct installation
  5. Earth electrode installation
  6. Land plant termination
  7. Land plant testing and commissioning

For most Repeatered Submarine Cable Systems requiring PFE Ocean Ground Bed, we have the capability to install the Earth Electrode up to 10m depth underground.